Construction & Engineering
What We Do
OUR MAIN AREAS OF ACTIVITY ARE:
Areas of Activity
Proiecte realizate
Infrastructure projects for the transportation and distribution of natural gas, including high-pressure interstate pipelines and local distribution networks. Works cover pipeline installation, construction of valve stations and gas distribution stations.
Value: 2 mil. Euro
Works: installation of DN300–DN600 pipeline, length 27 km; construction of valve stations R8, R9, R10, R11.
Value: 17.7 mil. MDL
Works: installation of high and medium pressure gas pipeline, 18.7 km, DN90–DN160; GDS.
Complex drinking water supply projects for urban and rural communities in the Republic of Moldova. Works include construction of main aqueducts, treatment and pumping stations, reservoirs, disinfection stations, and individual consumer connections to distribution networks.
Value: 53.5 mil. MDL
Works: water networks – 54 km; 3 pumping stations; 14 disinfection stations; 3 water towers.
Value: 92.67 mil. MDL
Works: rehabilitation of 5 existing boreholes, construction of a Water Treatment Station; rehabilitation of existing 1000 m³ reservoirs; construction of a Water Pumping Station; modernization of PS-3, rehabilitation of existing reservoirs V=1000 m³, 2×300 m³; rehabilitation and extension of water distribution networks totalling approx. 26 km; individual connections – 1,132 consumers.
Value: 92.67 mil. MDL
Works: Cupcui: construction of water distribution networks (16.9 km) and consumer connections (442 consumers); construction of the main supply pipeline A9 (7.3 km); construction of 2 above-ground tanks (V=50 m³) from thermally insulated metal panels with EPDM membrane; construction of 2 sodium hypochlorite disinfection stations.
Romanovca: construction of water distribution networks (6.7 km) and consumer connections (168 consumers); construction of sodium hypochlorite disinfection station.
Filipeni: construction of water distribution networks (36.5 km) and consumer connections (965 consumers); construction of sodium hypochlorite disinfection station.
Iargara: construction of prefabricated Pumping Station (1 working pump, 1 standby: Q=3.60 l/s, h=30 m); construction of water distribution networks (35.5 km) and consumer connections (1,834 consumers); construction of sodium hypochlorite disinfection station.
Value: 53.4 mil. MDL
Works: construction of external water supply networks with a total length of 22 km from PE pipe DN315–75; installation of hydraulic equipment at the Pumping Station; construction of 2 drinking water reservoirs with EPDM membrane V=800 m³; construction of internal water supply networks and connections in villages Lebedenco and Hutulu Ursoaia (DN90–50); construction of 4 above-ground tanks with EPDM membrane V=50 m³.
Value: 60.92 mil. MDL
Works: construction of fish protection system; construction of the main aqueduct approx. 23 km in length (DN400–90); modernization of the water treatment station; construction of pumping station Q=364 m³/h; construction of 2 re-pumping stations; construction of 2 drinking water reservoirs with EPDM membrane V=800 m³; rehabilitation of underground reservoirs; SCADA.
Value: 1.8 mil. Euro
Works: modernization of Pumping Stations through design, supply and installation of 5 pumps and motors at PS Buiucani and PS Independenței, as well as one pump and motor (6 kV) at PS Vadul lui Vodă; supply of pump units at WWPS Vatra, Motel, Codru, Costiujeni and Vieru.
Projects for the construction and extension of sewerage systems for the collection and treatment of wastewater in urban and rural localities. Works include external sewer networks, wastewater pumping stations, treatment plants and individual consumer connections.
Value: 13 mil. Euro
Works: construction of water and sewerage networks in the localities of Cotihana, Crihana Veche and Cahul.
Value: 10.9 mil. Euro
Works: construction of external sewer networks 29.5 km, individual consumer connections to the sewer network 2,029 units; construction of 4 prefabricated WWPS; design and modernization of the Main Wastewater Pumping Station. Water: construction of a new Water Pumping Station (PS-01) Q=381 m³/h, H=55.00 m, P=75 kW, including ATD, EEP; EEP and SCADA integration; construction of the Prut River intake system – 482 m.l.; construction of external water networks from ductile iron DN500 – 69 m.l.
Value: 62.3 mil. MDL
Works: construction of external sewer networks 19 km; inspection manholes – 848 units; 4 prefabricated WWPS.
Value: 20.61 mil. MDL
Works: construction of external sewer networks 10 km; concrete inspection manholes: 314 units; construction of 2 prefabricated WWPS; construction of MBBR-type WWTP with capacity 2×100 m³/day and associated electrical networks; installation of prefabricated septic tanks in 40 households.
Value: 46.44 mil. MDL
Works: construction of the sewerage system from PP SN10 pipes D200 (11.08 km) and pressure pipeline from HDPE pipes D110 (0.87 km); construction of the sewerage system from PP SN10 pipes D160 (1.56 km); construction of PP manholes – 645 units; construction of automated wastewater pumping station SPC-1 from HDPE with capacity 8 l/s and pumping head h=26 m; connection of 717 consumers to the sewer networks via PP D400 inspection manholes and PP SN8 multilayer pipes with socket and gasket D160 (approx. 3.5 km).
Modernization and rehabilitation projects for district heating infrastructure, including replacement of pump units, installation of frequency converters, mounting of IHS and construction of pumping stations. Works contribute to improved energy efficiency and reliability of centralized heating systems.
Value: 6.67 mil. Euro
Works: delivery and installation of 19 pump units and 10 medium-voltage converters; installation of cables, valves, filters and commissioning.
Value: 2.16 mil. Euro
Works: design, supply and installation of 3 pump units (5,500 m³/h), 2 frequency converters, 3 transformers, modernization of the existing pumping station building.
Value: 2.3 mil. Euro
Works: design, supply and installation of 169 individual heat substations.
Value: 4.05 mil. Euro
Works: design, supply and installation of IHS at 114 public institutions.
Value: 2.5 mil. Euro
Works: design, supply and construction of the Pumping Station, including 3 pump units (1,400 m³/h with pumping head of 85 m), 3 frequency converters, 4 electrical transformers, installation of pre-insulated pipes DN700 and others.
Rehabilitation and modernization projects for agricultural irrigation systems, with international financing. Works include construction of river intakes, conveyance pipelines, irrigation networks and large-capacity pumping stations serving agricultural land.
Value: 157.5 mil. MDL
Works: construction of river intake [DN530] from the Dniester River – 228 m.l., including construction of fish protection system; construction of conveyance pipeline DN800 – 3.92 km; reconstruction of water reservoir V=82,650 m³; reconstruction of Water Pumping Station PNS-9: 4×Q=905 m³/h, H=90 m, N=355 kW; construction of irrigation networks DN350–DN800 – 45 km; reconstruction of Water Pumping Station PNS-8: 2×Q=1,450 m³/h, H=150 m, N=800 kW.
Projects for the installation of air conditioning and ventilation systems in public and institutional buildings, with integration of associated technical networks.
Value: 7.68 mil. MDL
Works: construction of the air conditioning system (cooling 4×117 kW; heating 4×88 kW); construction of external gas networks.
Complex thermal rehabilitation and modernization projects for public buildings, aimed at reducing energy consumption. Works include envelope insulation, installation of photovoltaic panels, modernization of interior installations and landscaping of surrounding areas.
Value: 25.01 mil. MDL
Works: roof rehabilitation and installation of a new rainwater collection and drainage system; installation of photovoltaic panels with a capacity of 10 kW; installation of lightning protection system; thermal insulation and exterior finishing works; installation of windows and doors; interior finishing works; removal of the canopy at the main entrance and its reconstruction using a metal frame structure; reconstruction of damaged reinforced concrete stairs around the building perimeter and in the inner courtyard; modernization of sanitary facilities; modernization of the canteen; modernization of rainwater, water supply, sewerage and heating networks; installation of mechanical ventilation system with heat recovery; installation of IHS; construction of interior and exterior electrical systems; installation of alarm system; inner courtyard landscaping and other works.
Value: 61.61 mil. MDL
Works: roof rehabilitation and installation of a new rainwater collection and drainage system; installation of photovoltaic panels with a capacity of 10 kW; installation of lightning protection system; thermal insulation and exterior finishing works; installation of windows and doors; interior finishing works; removal of the canopy at the main entrance and its reconstruction using a metal frame structure; reconstruction of damaged reinforced concrete stairs around the building perimeter and in the inner courtyard; modernization of sanitary facilities; modernization of the canteen; modernization of rainwater, water supply, sewerage and heating networks; installation of mechanical ventilation system with heat recovery; installation of IHS; construction of interior and exterior electrical systems; installation of alarm system; inner courtyard landscaping.